Cheboygan to Pellston Transmission Line
Michigan | 2023
The Hydaker-Wheatlake Co. crews performed the rebuild of approximately 19 miles of 69 kV transmission lines. The existing 69 kV line was rebuilt to be operated at 138 kV. This project included replacing 201 structures.